Tuesday, July 18, 2017

Sewing Room Location

We had another dandy storm last night but this one brought some much needed rain.  The thunder woke me about 1:00.  I could hear the rain coming down but after 1:05 a.m. I have no idea how long the rain lasted.  The streets were still wet and dotted with puddles as we made our rounds this morning.

The trenches were not full of water so it must have all soaked into the dry dust.  The crews at the north 40 were busy busy busy.  We stopped to watch the "sheep's foot" compacting the soil over the pipes that were already buried.  Watch this short video and you can see that the compacting means business as it actually lifts up the front of that huge machine.



Here's a closeup of the attachment:



We saw a sign and some construction cones indicating the new location of the sewing room.



I bet the crew will be happy when they get the palm trees finished.  They're still dropping the branches here to let them dry out before loading up to the landfill.


**************************


http://static.knittingparadise.com/upload/2017/5/4/167202-9e5594982073afbfd2e2238a49.jpg