Remember the "sheep's foot" I mentioned in yesterday's post?  Well, here it is busy at work filling in that bottom trench of the sewer line.  Couldn't get a closer picture from so far away, but will get a better shot later.

 

They're pulling out the model from the street of dreams and making room for the new one.
 
 
The golf course is getting ready for aeration so is peppered with flags to mark the sprinkler heads.
 
It would be a little tough to golf here right now.
 

Look at the nice quilted piece I found in a home this morning.  Awesome!
 

The Pottery Room is open several days a week.  Peg Tomaso and Suzette Taylor.
Leo Semone 

Artwork in progress. 

Natalie Aaron and Jeanette Girard. 

Sue Neuman 

I noticed the Stained Glass Room is open several days a week also.Gym Flader is monitoring and Nancy was there cutting up some small bits of glass to make circles???  At least that's what she told me!


Gym's newest mosaic work.

****************


Not much else to report today so I'll leave you with this entertaining site.  Click on the link below to see some digital magic.  Put your mouse pointer just over the guy's head when he stops running.

Click Here


Posted by Picasa

Tuesday, May 21, 2013

Construction Update

There are so many projects at Palm Creek that we don't give much thought.  There is a perimeter wall all around this huge resort.  This summer it is getting patched and painted on both sides all the way around.  First it gets power washed, then patched with caulk, then painted.  I'm guessing we'll see this crew here for quite a while until the job is done.



We've been curious about all the huge mounds of dirt we see out in the construction area so Monday's tour with Jim Dawson was quite enlightening.  This blue water trench and piping will eventually go all aound the new construction area.  




It must be quite something for an engineer to draw out a plan like this and then see it come to fruition.



We must not forget special lines for fire hydrants!



This trench digging is a lot different than the first couple blocks that were laid out.  This time a wide trench is dug at varying depths.  First the deep green sewer line gets installed and covered.  You can't just throw dirt back in there to cover it up either.  The soil has to be of a certain moisture so that a machine called a sheeps foot can tramp down the dirt properly and securely.  Then the next level up and to the left will be the water lines.  Then comes electric, phone, cable, etc....each at a different depth and distance apart.  


See the thin wire that stretches along the top of the sewer line??  That's so they can use an electronic sensor to locate the pipe and know exactly where it runs and where the connections are located once the pipes are covered.  If you have to make repairs or connections in the future, that will certainly come in handy.


That gray pipe to the left is the water line that was laid in previously.  Someday it will allow a new home owner to do run a dishwasher or take a shower.


It was fascinating to watch this crew at work.  They're measuring and cutting the sewer pipes to needed specifications.  That big round saw blade goes through pipes like a hot knife through butter.  Then they hold the end of the pipe against the side of the blade to bevel the edge perimeter so the pieces slide together easily.


The end then gets dipped in a bucket of glue and they can slide the fittings on the end of the pipe.


This crew must have been well trained and working together for quite some time as very little conversation was held.  Each person had a job to do and it made great efficient team work.






Each of those upright green posts is a sewer line to a new house some day.





The fence around the new dog park is underway.  Concrete footings and rebar are in place.





Up by the big pool area work continues on the sprinkler systems.  Now that the acorn trees have been removed, they're going to work on the sprinkler lines.  Digging down to long buried lines is not an easy chore!  Years of tree roots surround all the pipes.



I took this photo down the water way between sites 29 and 30.  By the time you picklers come back this fall, there will be a nice full sun screen up there to provide much needed shade.


Check out this creative stained glass yard ornament we spotted at site 492.  I'm guessing it is one of our avid water volleyball players.  Nice work!









Friday, May 17, 2013

Another Day

Just a couple miscellaneous shots from the new construction area and around the park.  The whole construction area is dug up like giant mole hills once again as trenches are dug for sewer, water, electric, phone, cable, etc.  



This corner in front of the ballfield (across from the trash dumpsters) will be the new dog agility park.  Ernesto is installing the fence which will be brick about 3 ft high and then the wrought iron on top. 


Several spec homes are being installed along the wall at the north end of the park.


New homes are also coming in on the first corner of the new section.
  
Thought we'd say hello to some of the walkers we meet in the early morning.  Say Hi to Jake and Cindy.

We caught Leah James out on the golf course on such a pretty morning.

Ooooohhhhhh....another hummingbird nest.  It's hard to believe how they can construct such a sturdy nest on just a thin wire!!!


**********************


The Law of Physics States it's easier to get up at 6:00 AM to play golf than at 10:00 AM to mow the lawn.

o A good drive on the 18th hole has stopped many a golfer from giving up the game.

o A good golf partner is one who's always slightly worse than you are. That's why I get so many calls to play with friends.

o A pro shop gets its name from the fact that you need to have the income of a professional golfer to buy anything in there.

o If your opponent has trouble remembering whether he shot a six or a seven he probably shot an eight or worse.